This is where the north drain flows into Lake Richmond.
Category: North Drain
-
Wednesday, 10 June 2026

The north drain at a bridge up from Lyttleton Street, above looking south east, below looking east with Lynch Avenue to the left.

-
Sunday, 07 June 2026

A bridge over the north drain near Christison Way and Houston Street. Above is looking east showing the light morning fog in the distance, below looking north west.
The bottom photograph shows the light fog on the Rockingham Beach Primary School oval that is on the Fisher Street side. This is from the south west corner (corner Fisher Street and Rosewood Street) looking north east the same as on 04Mar26.

-
Saturday, 30 May 2026

The north drain at Ritchie Drive, looking south south west, below looking east, and bottom looking east with Christison Way Reserve ahead to the left.


-
Tuesday, 26 May 2026

The north drain at Ritchie Drive, looking north east, below looking west with Rees Crescent on the left and Lynch Avenue on the right.

-
Monday, 25 May 2026

The north drain east of Bay View Street looking west, below looking east. The drain in this area to Ritchie Drive to the east is allowed to widen.

-
Saturday, 23 May 2026

The eastern end of the north drain where it disappears into piping, looking east. Below is looking west.

-
Friday, 22 May 2026

The north drain west of Bay View Street looking east, below looking west (back towards Fisher Street).

-
Thursday, 21 May 2026

The north drain on the east side of Fisher Street, looking west. This is the park shown on 21Jan26.
-
Wednesday, 20 May 2026

The north drain on the west side of Fisher Street. This is opposite the park shown on 21Jan26.

